Tuesday, November 25, 2008

DAY 191 - GOD is good!

With all the crazyness going on in our financial world, interest rates have been all over the place this year. Our construction rate was 5.75% but we couldn't lock in the permanent rate until we were about 20 days from closing. We have been watching the the past few weeks, but they have been hovering between 6.2 and 6.3%. Historically that's not a bad rate, but in the current conditions I was looking for 6% or better. This morning it dropped to 5.75% for a few hours and we locked it in!

As of this morning, we still had one bathroom to be finished (faucet, shower door, toilet), the kitchen sink drain and dishwasher needed to be hooked up and several odds and ends to be tied up. They are supposed to be finished today and we plan to start moving tonight.

I haven't posted any updated pictures because all the tools have been in the way. We plan on taking some before we move anything in and I'll try to get them posted soon. (maybe this weekend if our DSL gets installed).

Friday, November 21, 2008

DAY 186 - PUSHED BACK

So we are not going to make it by friday..but we should still make it by Thanksgiving....BARELY!

The appraiser is coming on Monday morning and they should be thru with the final touches on Tuesday. Our new plan is to move in on Wednesday (the day before Thanksgiving).

The tile and wood floors are in, phone is hooked up, propane is in, faucets are installed, dishwasher, kitchen sink, lights, smoke detectors are installed (did you know that Home Depot has a whole isle of different types of smoke detectors? ugh). The garage door is in and they are starting the carpet this afternoon.

After much deliberation, we decided that the kitchen just wouldn't look right with our old white refrigerator in it, so yesterday I stopped by Sears (they know me well by now) to order a new one. Well, it was on sale so we got a good price on it, but as luck would have it the one we want won't be in until December 2nd.

These pictures are from a few days ago when it was pretty messy. I'll get some new pictures this weekend.

Tuesday, November 18, 2008

DAY 183 - FINAL SPRINT

We finally found the travertine (tile) on Friday and he got it installed yesterday! I would post a picture of it, but I left my camera at work yesterday :(

I'll try to get a picture of it tonight.

The tile guy showed up on Sunday afternoon. He should be done with the tile today and hopefully start on the wood flooring either today or tomorrow. We also got our electric pole up yesterday so we have power to the house now. We also got the cabinet doors in and he got all the wood beams up in the Dining room. There is still a lot to be done, but we are sprinting to the finish line.

The appraiser is scheduled to come out on Friday, and we are hoping to begin moving on Saturday. It doesn't seem like enough time to get it all done...we will see.

Thursday, November 13, 2008

Day 179 - PRESSING ON

They got our laminate installed yesterday and finished up the stone. Now we are in the middle of a fiasco with the Tavertine Michelle had picked out for the backsplash. We weren't originally sure if she was going to use it, or how much we were going to need, so we just bought a sample of it. Well, as luck would have it, now that she has settled on what she wants we can't find it again! I went into Houston this morning to pick up Josiah's new bunk bed and stopped at a Lowes and Home Depot and couldn't find it. I have one more store to try before they begin installing the Tile on Monday.

Monday, November 10, 2008

DAY 173 - Stone Started

I picked up Michelle's stove and dishwasher this weekend and ordered my Christmas present.....a 50" Plasma TV.

After three weeks of hearing "I'll be there next week" the mason finally showed up on Wednesday afternoon.

By the end of the day Friday, they were almost finished with the garage wall. He should be completely finished by midweek.

We now have our septic installed, water line connected and countertops built. This week should prove to be very busy ans we are looking to see the electricity connected, propane installed, lights and outlets installed, attic stairs installed, faucets installed, cabinet drawers and doors installed, cedar trim installed on porch and beams installed in the Dining/Play room.

That will still leave the outside A/C unit, kitchen laminate, tile flooring, wood flooring, toilets, carpet, appliances, garage door, touch up painting and cleanup to be done before the 21st.

Wednesday, November 5, 2008

DAY 165 - Marble

We got the marble in last Thursday. They still have to finish the guest Shower and will have to come back after the Tile and faucets are installed to finish the surroundings on the Master Bathtub but it's finally coming together.


On a seperate note...we are still waiting on the Stone to be installed!!! He was supposed to start today, but now it's tommorrow...

I spent most of this morning trying to coordinate with the bank, builder and Appraiser. Our hope is to move in the weekend before Thanksgiving. The house is supposed to be finished by that friday (November 21st) but we have to get the appraiser there before we can move in, and the house has to be very close to finished before he can do the appraisal. The trick is giving him enough notice that he gets it done before the 21st without showing up too early. I'm loosing the rest of my hair :)